2018 Street Rehabilitation Project-HMA

Description

This project consists of rehabilitation of streets at various locations throughout the City of Windsor Heights, that includes approximately 13,000 feet (30 blocks) of hot mix asphalt (HMA) overlay along with concrete street patching.  The following streets are proposed to have HMA overlay:

  • 69th Street between Washington Avenue and Hickman Road
  • Northwest Drive between 69th Street and Franklin Avenue
  • Allison Avenue between 66th Street and 64th Street
  • 66th Street between south end and Lincoln Avenue
  • 66th Street between School Street and University Avenue
  • 70th Street between University Avenue and Colby Avenue
  • Mott – 69th Street to 66th Street
  • School St – 64th to 65th
  • 65th St – School to Lamar Pl
  • Lamar Pl – 65th to 64th S

2018 Street Rehabilitation Project Map

Contract Amount                                                          

  • $426,336.50                                                                   

Estimated Start Date

  • April 16, 2018

Estimated Completion Date

  • August 31, 2018

Contractor(s)

  • Grimes Asphalt and Paving Corporation

Engineer

  • Matt Ferrier and Justin Ernst, Bolton & Menk  515-259-9190

City Staff Project Contact

  • Public Works Director Dalton Jacobus 515-645-6825


Project Status

  • The Contractor will be patching and paving on 69th Street north of Timmons Drive on Monday, July 9th. The Contractor is waiting to finish patching and paving south of Timmons Drive until sump pumps stop running at a slower rate and until a determination if a storm sewer repair is needed at the intersection with Washington Avenue. This work is anticipated to be completed later in the week. These streets will be closed to traffic while paving occurs. Those affected residents have been notified. All work is weather dependent.

    Work will begin on 70th Street between Colby Avenue and University Avenue starting Monday, July 9th. This segment will be milled, patched and a new surface placed. The roadway will be closed to thru traffic for the duration of the work. A marked detour will be in place for motorists to follow. All work is weather dependent.