2020 PCC Patching Project

The three locations where extensive patching will be done on existing pavement are the bridge approaches on 73rd Street as the road crosses Walnut Creek, the outside southbound lane on the 900 block of 73rd Street near the entrance to the YMCA, and the intersection of 70th Street and Hickman Road south towards Wilshire Blvd. The pavement at these locations has deteriorated badly and is in need of patchwork. Public Works staff has spent considerable time filling potholes on these three stretches of road over the last five years. Plans for this project are still being put together and will be presented to the City Council in February. Construction is expected to happen any time during the 2020 construction season.

9/25/20 Update

During the week of September 28th, work on the bridge approaches over Walnut Creek on 73rd Street will continue with concrete work on the outside lanes in both directions. Traffic will continue to travel on the center lanes and work will continue on the outside lanes. Both north and southbound 73rd Street will be reduced to one lane in each direction for the duration of the project. In the coming weeks, work will begin on the southbound lanes south of the railroad tracks near the YMCA. Watch for traffic lane closures. For everyone’s safety, monitor traffic control changes. Do NOT follow trucks into the work zone.

9/18/20 Update

During the week of September 21st, work on the bridge approaches over Walnut Creek on 73rd Street will continue with concrete work on the outside lanes in both directions. Traffic will remain on the center lanes and work will continue on the outside lanes. Both north and south bound 73rd Street will be reduced to 1 lane in each direction for the duration of the project. For everyone’s safety, monitor traffic control changes. Do NOT follow trucks into the work zone.

9/11/20 Update

During the week of September 14th, work on the bridge approaches over Walnut Creek on 73rd Street will continue with concrete work on the outside lanes in both directions. Traffic will move to the center lanes and work will continue on the outside lanes. Both north and south bound 73rd Street will be reduced to 1 lane in each direction for the duration of the project. For everyone’s safety, monitor traffic control changes. Do NOT follow trucks into the work zone.

8/21/20 Update

During the week of August 24th, work on the bridge approaches over Walnut Creek on 73rd Street will begin.  Both north and south bound 73rd Street will be reduced to 1 lane in each direction for the duration of the project.  For everyone’s safety, monitor traffic control changes.  Do NOT follow trucks into the work zone.

8/14/20 Update

The Contractor will be installing traffic signal loops on Saturday, August 15th.

8/7/20 Update

During the week of August 10th, the Contractor will pour concrete on the west half of the roadway. It’s anticipated that the closure will last until August 14th. Please find an alternate route. For everyone’s safety, monitor traffic control changes and no texting while driving. Watch for construction workers and the added construction truck traffic. Do NOT follow trucks into work zone.

7/31/20 Update

During the week of August 3rd, the Contractor will pour concrete on the east half of the roadway and then begin removals on the west half later in the week once they can drive on the east half. It’s anticipated that the closure will last until August 14th. Please find an alternate route. For everyone’s safety, monitor traffic control changes and no texting while driving. Watch for construction workers and added construction truck traffic. Do NOT follow trucks into work zone.

7/24/20 Update

During the week of July 27th, the Contractor will close 70th Street between Hickman Road and Wilshire Boulevard for street patching work. It’s anticipated that the closure will last until August 10th. Please find an alternate route. For everyone’s safety, monitor traffic control changes and no texting while driving. Watch for construction workers and added construction truck traffic. Do NOT follow trucks into work zone.